Abierta

SAT

SUN

MON

Veleta Borreguiles Pradollano
Temp. -4 -2 1
Visib. Parcial Parcial Parcial
Veloc. 70 60 20

Previsión de apertura

Pistas
6

Remontes
7

Km
7 Km

Aviso:
Remontes y pistas abiertos en función las condiciones meteorológicas.Tc. Al-Andalus en parada técnica. Ts. Emile Allais cerrado por hielo. - NO ESQUIAR FUERA DE PISTAS BALIZADAS. PELIGRO EXTREMO DE HIELO. - PRECAUCIÓN ESCASEZ DE NIEVE EN EL FINAL DE LA PISTA EL RÍO. - NO ESTÁ PERMITIDO EL ESQUÍ DE MONTAÑA EN LA PISTA EL RÍO POR MOTIVO… más info

Estado de Pistas

Abierta

-2°

Calidad
Dura

Espesores
30-40

KM
7,7 Km

Remontes

Pistas

Generado el 12/5/2025 a las 11:06 AM

JUNE 6, 2022

Sierra Nevada continues the renovation of the snow production system with 105 new cannons

Sierra Nevada has taken a new step in the renovation of its snowmaking system with the acquisition of 105 new high-tech cannons, which means that the Granadian winter resort has installed 315 new energy-efficient and highly effective units in the snow production in marginal conditions in the period of four seasons.

The new cannons, 40 low-pressure (TT10) and 65 high-pressure (TL8), have started to arrive in Sierra Nevada these days, from the Italian multinational Technoalpin, which was awarded the contract.

The Snow Production Department is going to distribute the 105 new units throughout the ski area, although the black slopes and the final section of the El Águila slope will be the areas that will be most reinforced. In the case of the black pistes, between Neveros and Fuente del Tesoro, 19 new cannons will be installed (10 TT10 and 9 TL8).

Río, Maribel, Trucha, Zorro, Zorro, Granados, Peseta, Rebeco, Zahareña, Loma Dílar, Villén or the Mirlo Blanco activity complex will be other points where the new cannons will be installed for the 2022/23 winter season.

Simultaneously to the installation of the new cannons, the Produced Snow department will relocate 8 cannons with the idea of reinforcing certain routes in Borreguiles, Cauchiles and the entrance to the Laguna area.

With this new contingent, financed with FEDER React funds - aimed at energy efficiency - Sierra Nevada closes a first cycle of integral renovation of the snowmaking system, with the almost complete replacement of old devices with new state-of-the-art ones.

Download area

Related news

Navidad

See more

Los Reyes llegan esquiando a Sierra Nevada rodeados de centenares de niños

See more

Sponsors


iconList iconList iconList iconList iconList iconList iconList iconList iconList
iconList iconList iconList iconList iconList